Case Study | Big Screens Make for an Easier Install | Tech Electronics
  • Commercial
    Providing technology solutions for businesses of all shapes and sizes
  • Construction
    Bringing decades of experience to your construction project
  • Education
    Designing, installing and servicing technology for learning environments
  • Government
    Delivering technology solutions to all branches of government
  • Healthcare
    Meeting the demands of modern healthcare through technology solutions
  • Industrial
    Empowering facilities with technology for today and tomorrow
  • Religious
    Equipping faith-based organizations with the latest technology
  • Work Smarter
    Tech Electronics gives organizations the tools to work more efficiently
  • Feel Safer
    Protecting people and property through life safety and communication solutions
  • Collaborate More Effectively
    Increasing productivity through technology-based collaboration tools

Pro AV Catalog

Research Our AV Products

Pro AV Catalog

Research Our AV Products

Pro AV Catalog

Big Screens Make for an Easier Install

Submitted By

Big Screens Make for an Easier Install
Contact Us
Description
Featured Products
Documents

THE JAMES E. BRUCE convention center—located in Hopkinsville, Kentucky, not far from Fort Campbell— boasts more than 26,000 square feet of space which can be divided into 11 separate rooms. The impressive facility includes terrace and patio spaces, open ballrooms, and small meeting rooms, and hosts a full schedule of events of all kinds. When convention center staff began surveying customers, however, they discovered there was a weak spot in their facility.

“On the questionnaires that were filled out by their customers, the AV side received the biggest complaints,” according to Peter Vaque, the President of Springtree Media Group LLC, Franklin, Tennessee. “There was nothing permanently installed so they were always scrambling to set up for the different events. The quality always suffered so we were asked to come up with a solution that would cover anything that came their way.”

Because of the size and layout of the center, Springtree decided that several screens were needed—and that they would have to be big. In the end, Vaque chose to go with four 165-inch diagonal 16:10 Premier tab-tensioned screens and two 278-inch diagonal Paragon tab tensioned screens. Due to the ability to control ambient light, and also budget restrictions, black-backed Matt White XT1000V viewing surfaces were used.

Even though these were some big—and heavy—screens, the Premier and Paragon screen cases actually brought some installation advantages to the project. I’m so glad we went with these,” Vaque says. “The competitors’ screens were heavier and required four flypoints. There were limited hang points at the structure so the Draper design saved our butts.”

The Premier screen case comes with mounting points for wall or ceiling suspended mounting built into each endcap. The Paragon case also features mounting holes for ceiling suspension in each endcap, and also ships with heavy-duty eyebolts on each end for use in hoisting the large screens up into position. Springtree installed four Hitachi CP-WX8255 5500 ANSI lumen projectors for the four Premier screens, and two Hitachi CP-WX8265 LCD projectors for the two massive Paragon/Series V screens.

So, what do convention staff and visitors have to say about the new permanently installed screens?

“The staff is giddy about the entire project,” according to Vaque. “They have already received rave reviews from several clients. The radio frequency (RF) remotes are fantastic and work the span of this massive building.”

“We have already heard back from clients on the brightness and ease of use,” confirms Petra Piffko, general manager for the Convention center. “With six projectors and screens situated around the room, we can accommodate just about any request without having to hang anything or run new cables.”